.

Elizabeth B. Ferguson

Portrait of Elizabeth B. Ferguson

Elizabeth is a member of the firm's Professional Liability Department. Her practice focuses on the defense of owners, contractors, material suppliers, developers, and design professionals (architects, engineers and surveyors) against claims of liability, breach of contract, construction defect, design defect, delay, liens/bonds, insurance coverage issues, and licensure issues. She also provides transactional support for her construction clients, including contract drafting and review. Elizabeth has been Board Certified in Construction Law by The Florida Bar since 2009 and is AV rated by Martindale-Hubbell. She served on the Florida Board of Professional Engineers, appointed by Gov. Rick Scott, from 2015-2018.

Elizabeth is a Construction Panel Arbitrator for the American Arbitration Association, has served as a professor of construction law, and is a frequent speaker on legal and construction industry issues. In 2019, she was selected as an "Ultimate Attorney" in the area of construction law by the Jacksonville Business Journal. As a Florida Board Certified expert in construction law, her typical matters include residential, commercial and roadway construction matters, from pre-suit through trial and arbitration. She also defends clients before professional licensing boards related to disciplinary and licensure issues.

    • Indiana University Maurer School of Law (J.D., 2002)
    • College of Wooster (B.A., 1999)
    • Florida, 2002
    • U.S. District Court Middle District of Florida, 2005
    • AV® Preeminent™ by Martindale-Hubbell®
    • The Best Lawyers in America®, Litigation - Construction (2022-2027)
    • Florida Super Lawyers (2018-2026)
    • Florida Trend, Legal Elite, 2023 Notable Women Leaders in Law
    • Florida Super Lawyers Rising Star-Construction Litigation (2009-2017)
    • Florida Trend Magazine, Legal Elite, Construction Law (2014, 2018, 2020, 2021)
    • Florida Trend Magazine, Up and Comer (2008, 2010-2013)
    • Ultimate Attorney, Jacksonville Business Journal, Construction Law (2019)
    • American Bar Association, Forum on the Construction Industry, 2009 – 2019
    • Associated Builders and Contractors
    • Chester Bedell Inn of Court
    • Florida Association of Women Lawyers
    • The Florida Bar, Board Certified in Construction Law, 2009- Present
    • The Florida Bar, Construction Law Committee, Co-Vice Chair; 2021-2022
    • The Florida Bar, Construction Law Committee, Pro Bono Chair, 2022 - 2023
    • The Florida Bar, Construction Law Review Course Steering Committee, Co-Chair, 2020-2023
    • The Florida Bar Construction Law Certification Committee, 2023-2024
    • The Florida Bar, Grievance Committee 4A, Vice-Chair, 2017-2020
    • The Florida Bar Judicial Nominating Procedures Committee, 2021-2024
    • The Florida Bar, RPPTL Section, Executive Committee Member, 2018-Present
    • Florida Board of Professional Engineers, Former Board Member
    • Jacksonville Bar Association, President: 2019-2020; Board of Governors: 2012-2020; Construction Law Section: 2011-Present
    • Phi Delta Phi, Wilkie Inn
    • "Big Impact on Duty to Defend Florida Construction Cases," Defense Digest, Vol. 24, No. 1, March 2018
    • Case Law Alerts, contributor, April 2018-present
    • Legal Updates for Construction Litigation, June 2017-present
    • Design Professional Liability, The Florida Bar Real Property, Probate, and Trust Law Section's Advanced Construction Law & Certification Review Course, Orlando, Florida, March 5-7, 2026
    • Florida Construction Law, Construction Licensing Officials Association of Florida Conference, May 29, 2025
    • Florida Construction Defect Litigation, Jacksonville Bar Association's Florida Construction Defect Litigation CLE Lunch & Learn, April 30, 2024
    • Design Liability, The Florida Bar Construction Law Institute, Orlando, Florida, March 23, 2024
    • Views from the Bench: Complex Construction Litigation – Trials and the Run-Up, The Florida Bar Real Property, Probate and Trust Law Section’s Construction Law Institute, Orlando, Florida, March 22, 2024
    • How Insurers Are Controlling Expert Costs in Construction Defect Claims, AM Best Webinar, November 7, 2023
    • The Impact of Altman on Defense and Indemnity Obligations in Florida, CLM Webinar, September 2018
    • Defense of construction, engineering and inspection sub-consultant on an FDOT project with a value over $111 million, involving claims brought by contractor for professional negligence and breach of duty.
    • Defense of large southeast residential developer and home builder against claims by individual owners for construction defect, including improperly installed stucco, windows and roofing systems. Represented same builder in over 100 suits against the original subcontractors to recover costs incurred by the builder for remediation and repair of the homes.
    • Defense of construction, engineering and inspection contractor from claims of insufficient maintenance of traffic in a roadway construction zone, case involved the death of two eighteen year olds.
    • Defense of subcontractor against multi-million dollar construction defect and unfair trade practices claims by general contractor and owner. Case involved construction of multiple buildings, water intrusion and mold claims.
    • Defense of nation-wide residential developer and home builder in a multi-million dollar construction defects and mold claim brought by individual owners seeking class certification of over 350 homes.
    • Welcome v. Arvida, 903 So. 2d 942 (Fla. 1st DCA 2005)
    • Board Certified Specialist, Construction Law, The Florida Bar

Thought Leadership

Legal Updates for Construction Litigation

Proposed Changes to Florida’s Statutes of Limitations and Repose Would Greatly Impact Construction Defect Litigation

January 11, 2022

A new bill has been proposed in the Florida Legislature that would amend the statutes of limitations and repose greatly impacting construction defect litigation.  The original bill proposed to rewrite Fla. Stat. 95.11(3)(c) by completely eliminating the ten-year statute of repose for latent defects, instead requiring all actions founded on the design, planning, or construction of an improvement to real property to be filed within four years. The proposed four-year time period would begin from the date of actual possession by the owner, the date of the issuance of a certificate of occupancy, the date of abandonment of construction if not completed, or the date of completion of the contract or termination of the contract between the professional engineer, registered architect, or licensed contractor and his or her employer, whichever date is latest.  After introduction of the bill, the Committee on Community Affairs proposed a complete overhaul of 95.11, as it relates to construction defect litigation. The Committee proposes a new subsection be added to Fla. Stat. 95.11, subsection 12, titled “ACTIONS RELATING TO AN IMPROVEMENT TO REAL PROPERTY.” This new section lays out 4 categories of improvements: Category 1 improvements cover detached single-family home, including pre-manufactured homes, or standalone building structures intended for use by a single business, occupant or owner, not exceeding three stories in height and related improvements to such homes, buildings or structures.  Category 2 improvements include single-family dwelling units not exceeding three stories in height which are constructed in a series or group of attached units or a commercial or nonresidential building not exceeding three stories in height and related improvements to such dwellings, buildings or structures.  Category 3 improvements include commercial or residential buildings or structures of four or more stories in height and related improvements to such buildings or structures.  Category 4 improvements is a catchall for any improvement that does not fall under Categories 1-3.   Further, the proposal amends the statute of limitations to read: “An action founded on the design, planning, or construction of an improvement to real property may be commenced within 4 years after the time to commence an action begins to run.” The repose period would be shortened to five years after the time for commencing an action begins to run for category 1 improvements; seven years for category 2 improvements; 12 years for category 3 improvements, and 10 years for category 4 improvements. The time to commence such an action would begin to run from the date of actual possession by the owner, the date of the issuance of a certificate of occupancy, the date of abandonment of construction if not completed, or the date of completion of the contract or termination of the contract between the professional engineer, registered architect, or licensed contractor and his or her employer, whichever date is earliest.  The proposed amendment contains a limited one-year extension of time for counterclaims, cross-claims, and third-party claims that arise out of the conduct, transaction, or occurrence set out or attempted to be set out in a pleading that the current statute contains. It also maintains that warranty work or correction or repair of defects to completed does not extend the period of time within which an action must be commenced.   If signed into law, these amendments would apply to any action commenced on or after July 1, 2022, regardless of when the cause of action accrued. However, any action that would not have been time barred before the amendments may be commenced before July 1, 2023. Any action not commenced by July 1, 2023, that is barred by the amendments is barred.   Legal Update for Construction Litigation – January 11, 2022, has been prepared for our readers by Marshall Dennehey. It is solely intended to provide information on recent legal developments, and is not intended to provide legal advice for a specific situation or to create an attorney-client relationship. We welcome the opportunity to provide such legal assistance as you require on this and other subjects. If you receive the alerts in error, please send a note to tamontemuro@mdwcg.com. ATTORNEY ADVERTISING pursuant to New York RPC 7.1. © 2023 Marshall Dennehey. All Rights Reserved.

Case Law Alerts

Florida’s Fourth Circuit continues trend requiring apportionment of damages in construction cases.

January 11, 2021

The Court of Appeals rejected the arguments of the plaintiff and held the apportionment of damages by the underlying court utilizing comparative fault was proper. As a result, the allocation of damages by the underlying court per § 768.81, Florida Statutes, was also proper. However, the Court of Appeals did reverse on the amount of damages. The court specifically affirmed that Part II of Chapter 768, Florida Statutes, applies to any action for damages, whether couched in tort or contract. Further, the court noted that, although § 768.81(3), Florida Statutes, requires apportionment of damages in “negligence” actions, negligence is defined in the statute as: . . . without limitation, a civil action for damages based upon a theory of negligence, strict liability, products liability, professional malpractice whether couched in terms of contract or tort, or breach of warranty and like theories. The substance of an action, not conclusory terms used by a party, determines whether an action is a negligence action. § 768.81(1), Florida Statutes (emphasis added). This new ruling out of the Fourth Circuit continues the trend in Florida requiring apportionment of damages in construction cases, throwing aside the previous use of joint and several liability.   Case Law Alerts, 1st Quarter, January 2021 is prepared by Marshall Dennehey Warner Coleman & Goggin to provide information on recent developments of interest to our readers. This publication is not intended to provide legal advice for a specific situation or to create an attorney-client relationship. Copyright © 2021 Marshall Dennehey Warner Coleman & Goggin, all rights reserved. This article may not be reprinted without the express written permission of our firm.

Firm Highlights

Thought Leadership

Pennsylvania HB 2307: Special Education Contingency Fund Reform

Pennsylvania school districts and school law attorneys are aware of the increasing cost of special education services. In an effort to address this growing squeeze on school district budgets, a bi-partisan group of Pennsylvania House Representatives introduced House Bill 2307. The bill is a special education funding measure intended to reform Pennsylvania's reimbursement system for extraordinarily high-cost special education students. As written, HB 2307 would increase funding dedicated to Pennsylvania's Extraordinary Special Education Program Expenses reimbursement program. Beginning with the 2026-27 school year, the bill would increase the set-aside from 1% to 2% of the annual Special Education appropriation. The increased funding is aimed at assisting school districts and charter schools address the costs of serving students whose needs generate exceptionally high special education expenses. The proposal specifically targets situations involving students whose annual special education costs exceed the state's highest cost threshold and represent a significant burden on a district's special education budget. HB 2307 includes key eligibility requirements such as: 1) extraordinary special education expenses approved by the Secretary of Education; 2) student costs exceeding the state's highest Category 3A threshold; 3) costs representing at least 1% of the district's total special education expenditures; 4) student enrolled in the district for no more than two consecutive school years for the proposed reimbursement category; and 5) application and documentation requirements for districts and charter schools. HB 2307 successfully passed the Pennsylvania House of Representatives on June 16, 2026, by a unanimous vote of 202-0. It was subsequently transmitted to the Senate and was referred to the Senate Education Committee on June 22, 2026, where it currently remains pending. While there is currently no scheduled Senate committee or floor vote publicly listed for HB 2307, the next step would be for the Senate Education Committee to consider the bill and determine whether to report it to the full Senate for consideration. If approved by the committee, the bill would proceed through the Senate's three-consideration process before a final vote. Because the General Assembly is still within the 2025-26 legislative session, the bill remains eligible for action during the remainder of the session. However, absent committee action, it will not become law before the start of the 2026-27 school year. If enacted, HB 2307 could have several important effects: Greater financial stability for districts serving students with exceptionally expensive educational and related-service needs. Increased reimbursement opportunities for high-cost placements, specialized transportation, intensive behavioral supports, and other extraordinary services. Reduced pressure on local special education budgets, particularly in smaller districts where one or two high-cost students can significantly affect annual expenditures. Potential reduction in litigation and placement disputes driven by financial constraints, although the bill does not alter substantive IDEA rights or district obligations to provide FAPE.

Thought Leadership

U.S. Department of Education Reports to Congress on Disciplinary Removals of Children with Disabilities

In June 2026, the United States Department of Education, through the Office of Special Education and Rehabilitative Services (OSERS), published its “47th Annual Report to Congress on the Implementation of the Individuals with Disabilities Education Act, 2025.” In its report, OSERS provided detailed data and information on the discipline and removal of students from their educational placements, specifically for the school year 2022-2023. To obtain this data, all 50 states, the District of Columbia, the Bureau of Indian Education, Puerto Rico, and other U.S. territories, were asked to report on pre-school and school-aged students, ages 3-21, who were served under IDEA, Part B, and removed from their educational placements for disciplinary reasons during the school year in question. Not all jurisdictions had data available; OSERS’ reporting to Congress was based on the information supplied by the jurisdictions that responded.  First, OSERS examined the total number of served students who were removed to an interim alternative educational setting. From the reporting data, this number totaled 7,204,199 students. Of this total, 11,364 students were removed unilaterally by school personnel for drugs, weapons, or serious bodily injury to themselves or others. These figures reflected the unilateral removal of served students at a rate of 16 per 10,000 students. Of this total, 545 students were removed by a due process hearing officer for likely serious bodily injury, a rate of one per 10,000 students.  Next, OSERS examined data for students who were suspended (in school and out of school) or expelled for more than 10 school days. The total number of students in this category was 7,623,095. Of this total, 65,104 students received out of school suspensions or expulsions, a rate of 85 per 10,000 students. A total of 21,878 students received in school suspensions, a rate of 29 students per 10,000.  OSERS evaluated this particular data and drilled down further, examining the rate of interim removal, expulsion, and suspension per 10,000 students based specifically upon each IDEA disability category. Perhaps not surprisingly, children primarily identified with emotional disturbance were the most affected.    For every 10,000 students who were identified under the category of emotional disturbance, 65 were unilaterally removed to an interim alternative educational setting by school personnel (not the IEP team) for drugs, weapons, or serious bodily injury, and four out of every 10,000 students were removed following a hearing officer finding that there was a substantial likelihood of serious bodily injury to the student or others. By contrast, the ratio of students under each of the other disability categories who were unilaterally removed by school personnel was 25 or less per 10,000 students in each category. No more than two students per 10,000 in each of the other categories were removed by a hearing officer. Other Health Impairment was the second leading category.  For every 10,000 students identified primarily with emotional disturbance, 411 students received out of school suspensions or expulsions of more than 10 days, and 107 of every 10,000 students in this category received in-school suspensions. In comparison, the ratio of students under each of the other disability categories who received out of school suspensions or expulsions of more than 10 days was no more than 172 per 10,000. Students identified in all other disability categories received in-school suspensions at a rate of no more than 57 per 10,000 students. Again, Other Health Impairment was the second leading category. OSERS then examined discipline data with a state-by-state comparison, once more at a ratio of 10,000 students served. The overall data of students who were unilaterally removed to an interim alternative educational setting by school personnel for drugs, weapons, or serious bodily injury showed that removal occurred most frequently in Texas (92 per 10,000 students), Montana (62 per 10,000 students), and Tennessee (42 per 10,000 students). The mean was 12.1.  In Pennsylvania, the rate of removal was 12 out of every 10,000 students, just below the mean.  OSERS also considered, on a state-by-state basis, the number of students who received out-of-school suspensions or expulsions of greater than 10 days. The most significant rate of discipline here occurred in North Carolina (256 per 10,000 students), Missouri (250 per 10,000 students), and South Carolina (250 per 10,000 students).  The mean was 85.83. In Pennsylvania, the rate of discipline was 57 per 10,000 students, well below the mean.  Finally, OSERS evaluated, on a state-by-state comparison, the ratio of students per 10,000 who were identified under the category of emotional disturbance and who received out of school suspensions or expulsions for greater than 10 days. The suspension or expulsion of students with emotional disturbance occurred most often in North Carolina (1,723 per 10,000 students), Missouri (1,127 per 10,000 students), and South Carolina (1,098 per 10,000). The mean was 485.81. In Pennsylvania, the suspension or expulsion of students identified with emotional disturbance occurred at a rate of 260 per 10,000, again well below the mean. Although OSERS did not draw any specific conclusions about the disciplinary data it collected, it is nonetheless evident that students primarily identified with emotional disturbance were removed from their educational placements for disciplinary reasons at a rate much higher than students in any other disability category. Relatively speaking, however, Pennsylvania acquitted itself well in the state-by-state disciplinary data collection.