Appellate Division Affirms Dismissal of Construction Zone Death Suit Against employer and Engineering Firms Based on Workers’ Compensation Bar and Failure to Serve Affidavits of Merit.

Estate of Mike Alexander, Deceased, et al. v. Northeast Sweepers, et al., No. A-1486-23 (June 19, 2025)

August 1, 2025

by Kiara K. Hartwell

On July 11, 2014, Michael Alexander was struck and killed by a sweeper truck while working in an active construction zone on the New Jersey Turnpike. Northeast Sweepers owned the truck, which was driven by Christopher Hackett. Crisdel Group, Inc. was the decedent’s employer and was hired as the general contractor. HAKS Engineers, Architects and Land Surveyors, P.C. was retained by New Jersey Transit Authority to provide “professional services” for the resurfacing project, including supervision to ensure compliance. John Schweppenheiser, a HAKS employee and licensed professional engineer, was the project manager. HAKS then subcontracted the construction inspection services to Johnson, Mirmiran & Thompson, Inc. (JMT). Lawrence Fink, a JMT employee and licensed professional engineer, was the supervisor. 

Christopher Hackett drove his sweeper around a milling machine and struck Alexander, who was taken to a hospital and passed away approximately a month later. While it was Crisdel’s practice to assign a dump truck to each sweeper truck, there was none near Hackett’s sweeper at the time of the accident. After the accident, OSHA cited Crisdel for violations; failure to provide a place of employment free from recognized hazards and to establish a pre-planned traffic pattern. It was noted to be a serious violation, but not willful or repeated. 

In October 2014, the plaintiffs filed a complaint, which they amended in January 2016 to add claims against HAKS and JMT. In the amended complaint, the plaintiffs alleged intentional wrongs, noting that HAKS and JMT were responsible for supervision of the site and that they had negligently supervised the project. Because Alexander and his estate received workers’ compensation benefits, Crisdel’s answer asserted the affirmative defense that the plaintiffs’ claims were barred by the Workers’ Compensation Act. HAKS’ answer demanded compliance with the affidavit of merit statute, and JMT’s answer made no reference, but did assert a general defense of failure to state a claim. 

In June 2017, HAKS and JMT moved to dismiss the claims for failure to serve affidavits of merit. After oral arguments, the trial court issued orders dismissing the claims, noting the negligence was in their professional capacities as engineers, therefore, affidavits of merit were needed. The plaintiffs then filed a motion for reconsideration and submitted two affidavits from professional engineers, who certified that the work HAKS and JMT performed only involved supervision, not professional engineering services. The trial court denied the motion for reconsideration in September 2017. 

After the Appellate Division granted leave to appeal, the orders dismissing the claims against HAKS and JMT were reversed for a more complete record on whether the claims required the affidavit of merit requirement. On remand, additional expert discovery was performed, and all parties produced more expert reports. In April 2018, Crisdel moved for summary judgment, and after oral arguments, the trial court granted summary judgment as the plaintiffs failed to produce evidence that Crisdel committed an intentional wrong as this was the type of accident that occurred in constructions areas. 

In May 2019, HAKS and JMT moved for summary judgment, arguing the plaintiffs’ claims involved professional engineering service malpractice claims. The trial court agreed and granted summary judgment, noting the expert reports and deposition testimony revealed the duties of HAKS and JMT were within the practice of engineering. As such, the plaintiffs needed to submit an affidavit of merit and failure to do so required dismissal of their claims. 

The other defendants were all dismissed at various times. In December 2023, the plaintiffs resolved their claims against Northeast Sweepers and Hackett. The plaintiffs then appealed the June 22, 2018, order granting summary judgment to Crisdel and the July 26, 2019, orders granting summary judgment to JAKS and JMT.

The Appellate Division reviewed, under the de novo standard, and delved into the Workers’ Compensation Act as well as case law regarding intentional wrongs. While the plaintiffs identified six areas (work lighting, audible backup alarms, properly functioning mirrors, dedicated dump trucks, use of spotters and written traffic control plan) that were allegedly known and ignored by Crisdel, the Appellate Division found none of them were evidence of an intentional wrong within the meaning of the Workers’ Compensation Act. The Appellate Division also noted the OSHA violations were only “serious” and not “willful.” As such, the Appellate Division affirmed the grant of summary judgment to Cristel.

As for the summary judgment granted for HAKS and JMT, the Appellate Division reviewed the case law for a claim against a licensed professional covered by the affidavit of merit statute. The Appellate Division noted it was undisputed that both defendants were engineering and architectural companies and that HAKS was retained by New Jersey Transit Authority for professional engineering services. HAKS then retained JMT, and under the terms of the subcontract, all work performed by JMT was required to be done under the “direct supervision” of “licensed professional” engineers. Given the undisputed evidence showed HAKS and JMT were providing professional engineering services and the plaintiffs failed to timely serve affidavits of merit, the Appellate Division affirmed the grant of summary judgment to HAKS and JMT. 


 

What’s Hot in Workers’ Comp, Vol. 29, No. 8, August 2025, is prepared by Marshall Dennehey to provide information on recent legal developments of interest to our readers. This publication is not intended to provide legal advice for a specific situation or to create an attorney-client relationship. We would be pleased to provide such legal assistance as you require on these and other subjects when called upon. ATTORNEY ADVERTISING pursuant to New York RPC 7.1 Copyright © 2025 Marshall Dennehey, all rights reserved. No part of this publication may be reprinted without the express written permission of our firm. For reprints or inquiries, or if you wish to be removed from this mailing list, contact tamontemuro@mdwcg.com.

Firm Highlights

Thought Leadership

First DCA Reverses Excessive Jury Award Unsupported by the Evidence

In December 2019, the plaintiffs filed a claim with Universal for damages caused by a water and sewage back up through the plumbing system and existing through multiple fixtures including the washing machine drain, kitchen sink, dishwasher, bathtub and toilet. Universal investigated the claim, issued payment for resulting water damage totaling $7,000.00 in actual cash value ($12,000.00 in replacement cost value). The plaintiffs sought additional benefits for work needed to access the below-slab cast iron plumbing system due to the failure of the system from rust, deterioration, corrosion and breaks in the line. Universal denied any additional benefits for access. In 2021, the plaintiffs filed suit. During litigation, Universal sent a plumber to inspect the home and the plumber concluded the pipes were clogged but could be cleaned. The plaintiffs’ plumber testified that the plumbing system needed to be replaced due to holes and openings in the pipes. The plaintiffs introduced two estimates prepared by Triad Restoration services totaling $79,680.22 in replacement cost value and $50,219.97 in actual cash value and an executed contract with another company for repairs with the amounts of repair redacted. Since the insurance policy did not provide coverage for repair or replacement of the plumbing system, the jury only had to decide whether the plumbing system needed to be replaced, and if it did, Universal would owe for the access costs; the jury verdict form required the jury to determine both the replacement cost value and actual cash value amounts. The jury asked if it had to rely on the Triad estimates for their amounts. The trial court advised the amount awarded had to be based on the evidence presented at trial and the law given by the trial court. The jury awarded $335,000.00 in replacement cost value or $305,000.00 in actual cash value. Universal motioned for a new trial arguing the amount awarded was unsupported by the evidence and then moved for remittitur. The trial court denied both motions and this appeal followed. The court found that while a jury’s verdict should only be disturbed with caution and discretion, the trial court must give the properly challenged award close scrutiny and determine whether it bears a reasonable relation to the damaged provided, is supported by the evidence, and could have been reached in a logical manner by reasonable means §768.74(3), (5)(d)-(e), Fla. Stat. The court found the trial court did consider the statutory requirements at the hearing on Universal’s remittitur motion and was concerned about a reasonable relation to the amount of damages proved and injury suffered and whether the award was supported by the evidence, but ultimately denied the motion, reasoning that the jury had been properly instructed to fairly and adequately compensate the plaintiffs. The court noted the only evidence providing the basis for the jury verdict was Triad’s estimates and those valued the plaintiffs' claimed loss at $79,680.22 in replacement cost value and $50,219.97 in actual cash value; no valuation evidence reasonably supported the jury verdict. The plaintiffs argued that the jury was entitled to consider more than the estimates, but the court conveyed the evidence provided did not give the jury a way to reach the amounts they awarded. The court was also not swayed by the plaintiffs’ argument regarding inflation and later price increases, but the court noted that no evidence via the contract, nor testimony regarding increase in labor, material, fuel or construction costs were entered into the record.  The court concluded the jury may draw reasonable inferences from the evidence, but it may not supply a damages number by speculation. The court did not find any of the plaintiffs’ remaining argument persuasive either. The court reversed the denial of Universal’s remittitur motion and motion for new trial as to damaged and remanded the case. The court ended its opinion with advising the trial court must determine whether replacement cost value or actual cash value is the property measure of damages under the policy and order remittitur in an amount consistent with that determination and the evidence.

Thought Leadership

United State District Court for the Middle District of Florida finds Evidence of Replacement Cost Value is Admissible and Recoverable Even When Repairs Have Not Been Made

The plaintiff filed a claim for damage as a result of Hurricane Ian. It claimed damages were over $24 million, but the carrier accepted partial coverage and paid $8,307.49 for secondary components. The carrier found hurricane damage to the building, but it was below the insurance policy’s $3.6 million deductible. The plaintiff sued for breach of the insurance policy. The carrier argued in a motion for summary judgment that plaintiff could not recover replacement cost value (RCV) because the property repairs had not been effectuated. The policy provided for RCV, but only after the repairs were completed. The carrier argued that because the repairs were not completed, the plaintiff was not entitled to RCV damages. The plaintiff argued the carrier could not withhold the actual cost value (ACV) due, which was the main allegation of the lawsuit, then fault it for not making the repairs to unlock the RCV. The United States District Court for the Middle District of Florida rejected the carrier’s argument, finding that when an insurer allegedly breached the policy by withholding coverage, it could not hide behind a repair-contingent provision to block the insured from RCV damages at trial. The court found the issue to be whether the contractual language designed to preclude certain coverage until after repairs are completed barred an insured from seeking those damages at trial when repairs were not complete. The court noted the Eleventh Circuit had not resolved this issue and neither side pointed to a definitive answer from the Florida Supreme Court. The court reasoned that it must look to the Sixth District Court of Appeal (6th DCA), which is the court which would have heard this case if it was in state court. The court noted the 6th DCA recently addressed this issue in Universal Prop. & Cas. Ins. Co. v. Rodriguez, 427 So. 3d 676 (Fla. 6th DCA 2026). The Rodriguez Court found that a breach of contract action is designed to adjudicate not only whether the contract was breached, but also evaluate the damages incurred had the breach not occurred, which the Rodriguez court found to be recovery of the RCV. This court also noted basic Florida contract principles compelled the same result, as a material breach frees the nonbreaching party to suspend its own performance and can demand the full benefit of its bargain, including RCV damages. Finally, the court found the distinction between a full denial and partial denial did not compel a different result. It found the policy required the carrier to acknowledge coverage and pay ACV for all covered damages, and the failure to do that is a material breach, entitling the insured to all of the damages available under the contract, which included the RCV.

Thought Leadership

Appeals Court Reverses Trial Court Order Awarding Attorney’s Fees Due to Lack of Evidence to Support Fee Awarded

The Fourth District Court of Appeal reversed the trial court’s order awarding appellate fees to People’s Trust Insurance Company based upon a lack of evidence to support the attorney’s fee award in RM & Assocs. Consulting, Inc. v. People's Trust Ins. Co., 2026 Fla. App. LEXIS 4654 (Fla. 4th DCA 2026). People’s Trust was the insurer of a residential property that had sustained water damage. RM & Associates Consulting was hired by the homeowner to perform mitigation services at the property. The homeowner assigned post-loss benefits to RM and RM subsequently filed suit against People’s Trust alleging that it had not been paid the money it was owed for the mitigation services. People’s Trust defended the lawsuit on the ground that the policy required the insured to notify the insurer before authorizing repairs so People's Trust could elect to use its preferred contractor. Because the owner did not comply with that provision, People's Trust asserted its liability was limited to the amount that its preferred contractor would have charged for the work, which People's Trust contended was $2,000. People's Trust paid that amount to RM before RM filed suit. People’s Trust filed a motion for summary judgment which was granted. RM appealed the summary judgment ruling and the ruling was upheld by the Fourth District Court of Appeal. The appellate court also granted People’s Trust’s entitlement to appellate attorney’s fees, subject to the trial court’s determination of the amount of fees, based upon an offer of judgment made by People's Trust. On remand, the trial court held an evidentiary hearing to determine the amount of attorney’s fees People’s Trust was entitled to. At the hearing, People’s Trust presented testimony from it’s fee expert, supervising trial counsel and appellate counsel. People’s Trust sought recovery of $24,866.17 for work performed by appellate counsel. The request primarily consisted of work performed in preparation of the answer brief. The fee expert testified that more than ninety hours spent preparing the answer brief was reasonable given the complexity and significance of the underlying issue. The appellate court found that the fee expert’s testimony fell short of meeting the necessary standard of demonstrating that the hours expended were necessary. The appellate court found that the billing records did not serve to cure the deficient testimony, as the billing records did not contain adequate details regarding the specific tasks performed. Rather the records contained entries such as “answer brief” which the appellate court found to be insufficient. The appellate court noted that neither the fee expert or counsel addressed how the prior research and briefing in the parallel litigation informed the work in the instant matter. The appellate court noted this was significant in that a court's attorney's fees award must exclude excessive, redundant, or otherwise unnecessary hours, citing Florida Patient's Compensation Fund v. Rowe, 472 So. 2d 1145 (Fla. 1985). Based upon the record failing to support the finding of the trial court, the 4th DCA remanded the case to the trial court for a reconsideration and redetermination of reasonable appellate attorney’s fees supported by competent substantial evidence. The 4th DCA reiterated that the fee expert’s focus on the quality of the work and the importance of the work to People’s Trust did not make up for the perceived deficiencies in the position that spending over ninety hours on a single answer brief was reasonable. Whether moving for attorney’s fees or challenging the amount of fees being sought by an opposing party, practitioners should be mindful of the evidence being used to support the claims being made. Parties should pay close attention to whether the hours being sought may be impacted by prior litigation either party may have engaged in. A party must be prepared to address how prior litigation efforts did or did not impact the amount of hours being claimed in current litigation. Lastly, billing records must be sufficiently detailed so as to support any potential future fee claim.